After Quote acceptance

✔ You’re Happy With Your Quote – What Happens Next?

  1. Quote Acceptance
    Once you’ve reviewed and approved the quote, we’ll send you a confirmation and request a deposit to lock in your project timeline.
  2. Final Site Check & Measure
    Our team will visit your home to complete a detailed site measure and confirm all specs and layout details.
  3. Design Finalisation & Material Selections
    We’ll guide you through selecting cabinetry finishes, benchtops, splashbacks, appliances, handles, and more. This is where your vision really starts to take shape.
  4. Schedule Confirmed
    We’ll provide a clear renovation schedule so you know exactly when things will happen. This includes demolition, trades, cabinetry install, stone benchtops, and final fit-off.
  5. Custom Cabinetry in Production
    Your kitchen is manufactured locally to fit your space precisely. Depending on the materials and availability, production usually takes several weeks.
  6. On-Site Renovation Begins
    The transformation starts! Our trusted trades team will complete demolition, electrical, plumbing, and installation as per the plan. Stone benchtops are templated after cabinets are installed.
  7. Benchtop Installation
    Stone benchtops are installed roughly 10 business days after cabinet installation. However, this timing may vary depending on the supplier’s workload.
  8. Plumbing, Electrical & Finishing Touches
    After the benchtops are in, the plumber and electrician return to complete all connections. Splashbacks, plastering, painting, and tiling are also finalised.
  9. Final Walkthrough
    Once everything is complete, we’ll walk you through your new kitchen, make sure you’re 100% happy, and provide care instructions for your new space.

🏡 From quote to completion, we guide you every step of the way to ensure a stress-free, beautifully finished kitchen renovation.